Eldeco
Eldeco Whispers of Wonder
Sector 22D, Yamuna Expressway
Price on request
RERA received
- 10 years in real estate, including my time at 99acres
- RERA-registered channel partner
- Google rating 4.9
We are channel partners for some of these builders, including Godrej, Stellar, Sobha and Prestige.
Key facts
- Price
- Price on requestNot on the UP RERA summary used for this page
- Configurations
- Not confirmed. Broker lists disagree, so none is printed.Futuristic Noida project list
- Plot
- GH-01C/1, Sector 22D. Promoter on the summary: Eldeco Sohna Projects Limited.UP RERA project summary, read for this site
- Towers / floors
- Not published in the sources used on this page.Not on the summary fields used here
- Possession
- Declared completion 17 July 2030UP RERA project summary
- Registration
- Registered 2 September 2025. The number is not printed.UP RERA project summary
Layouts
Bedroom sizes are not published in the sources used here, so this page does not draw a size chart.
Illustrative
Location and connectivity
- MetroNo station distance is in the summary used here.UP RERA project summary
- Yamuna ExpresswayThe plot is in Sector 22D under YEIDA. No kilometre figure is in the summary.UP RERA project summary
- Noida International Airport, JewarNo distance is in the summary used here.UP RERA project summary
Rohit's take
Opinion from Rohit Kumar Jha. Not a builder claim and not a ranking.
- It suits a buyer looking at Sector 22D who wants the declared completion on the register, July 2030, and who can wait for a written configuration and price.
- Confirm the promoter name, the plot, and the completion date on UP RERA. Do not take a bedroom mix from a portal until it matches the agreement.
- No payment plan is published here. Ask for it against the registered project, not against a nickname alone.
What the summary supports
Eldeco Whispers of Wonder, also called WOW, is on this site as an Eldeco project at Sector 22D on the Yamuna Expressway. The UP RERA project summary used for this page names plot GH-01C/1 and the promoter Eldeco Sohna Projects Limited. It shows a registration date of 2 September 2025 and a declared completion of 17 July 2030. This page uses those facts. It does not print the registration number. An engineer certificate linked from the portal is what placed the project in Sector 22D when locality lines elsewhere were loose.
Configurations are blank on purpose. Pages that sell the project do not agree on whether the mix stops at 4 bedroom or includes a 5 bedroom. Printing either list would pick a side this register extract did not settle. Price is on request. The summary fields used here did not include an apartment rate.
The status chip is RERA received because the summary shows a September 2025 registration. That chip is not a view on construction quality or on how many complaints the file may gather later. Open the live portal page when you are ready to pay, because a static article can lag a revision.
Price, floor plans and possession
Price on request. A payment plan is not copied here because it was not in the summary extract. Ask for the plan that matches the registered project, with milestones and the account named for collection. Do not pay against the nickname alone.
Possession on this page is July 2030, from the declared completion of 17 July 2030. If the portal later shows an extension, the portal wins. This article is not that live record.
No official floor plan or master plan is hosted here. The locked sketch is a generic flat, marked illustrative, blurred, and locked. It is not Eldeco's WOW layout. Sizes in square feet from a broker PDF are not repeated.
Sector 22D and the expressway
Sector 22D is YEIDA land along the Yamuna Expressway. It is not Sector 22D of some other city, and it is not a Greater Noida West sector. The map does not invent a distance to the aqua line, to a toll, or to Jewar, because the summary did not state those kilometres. The area guide linked from this page is the Yamuna Expressway and Jewar note.
Other Eldeco names in the same sector, including Ballads of Bliss on this site's wider list, are different records. Do not merge their completion dates into WOW. Rohit's take is an opinion about confirming the bedroom mix and the collection account. It is not a ranking. The engineer certificate on the portal is the document that fixed the locality as Sector 22D when shorter marketing lines were vague. You can open that file from the source link. It is not a price list and it is not a floor plan. When you compare WOW with Arihant Seasons or the NorthWind land result, keep the promoters apart: Eldeco Sohna Projects Limited, Arihant Urban Space Private Limited, and NorthWind Estates are three files, even though the sector name is the same.
Questions buyers ask
What is the Eldeco WOW price?
Price on request. The UP RERA summary fields used here do not include an apartment price.
Is there an Eldeco WOW floor plan on this page?
No. The locked drawing is illustrative. It is not Eldeco's floor plan or master plan.
What is the Eldeco WOW possession date?
The summary shows a declared completion of 17 July 2030. Check the portal for any extension before you rely on it.
Is Whispers of Wonder RERA registered?
The summary shows a registration dated 2 September 2025. The number is not printed on this page.
What are the configurations?
Not confirmed on this list. Disagreeing broker mixes are not printed.
Who is the promoter?
The summary names Eldeco Sohna Projects Limited, plot GH-01C/1, Sector 22D.