Short answer: SOBHA's own page says 3 and 4 bed homes at Sobha Rivana start from about ₹2.81 Cr. Add 5% GST, about 7% stamp duty and 1% registration and you are at roughly ₹3.18 Cr before extras like PLC, parking, club and IFMS. With 20% down, an illustrative loan of ₹2.25 Cr at 8.5% for 20 years is about ₹1.90 lakh a month.
All-in cost (3 BHK from ₹2.81 Cr)
| Item | Approx. amount | Note |
|---|---|---|
| Basic price (SOBHA offer, Oct 2026, from) | ₹281.0 L | Your unit, floor and size will differ |
| GST 5% (under-construction) | ₹14.05 L | Paid with each instalment |
| Stamp duty ~7% (UP) | ₹19.67 L | Women buyers get a small rebate; check IGRSUP |
| Registration ~1% | ₹2.81 L | Paid at registry |
| PLC, parking, club, IFMS, power backup | Ask SOBHA | Get it in the official cost sheet |
| Rough all-in (excl. extras) | ₹317.5 L | Before loan costs |
Illustrative EMI
| Assumption | Value |
|---|---|
| Down payment (20% of basic) | ₹56.2 L |
| Loan | ₹224.8 L |
| Rate / tenure (illustrative) | 8.5% / 20 years |
| EMI | ≈ ₹1.95 L per month |
Bank rates and eligibility differ. During construction you may pay only pre-EMI; see pre-EMI vs full EMI and home loan eligibility.
Official SOBHA payment schedule (Pricelist R3 w.e.f Aug 31, 2026)
| Milestone | Payable |
|---|---|
| Application amount | 9% of Basic Value (A) |
| Within 30 days of application (less application amount) | 15% of Basic Value (A), less application amount |
| Within 60 days of application | 5% of Basic Value (A) |
| Within 90 days of application | 10% of Basic Value (A) |
| Basement 1 roof slab or 15/01/2028, whichever is later | 10% |
| Fifteenth floor roof slab or 15/01/2029, whichever is later | 10% |
| Terrace roof slab or 15/01/2030, whichever is later | 20% |
| Internal flooring in the apartments (excl. balconies, utilities, common areas, shafts, ducts) or 30/04/2030, whichever is later | 10% |
| On application of Occupancy Certificate | 10% |
| On final payment request | 10% of Basic Value (A) & Deposits (B) |
Source: SOBHA Rivana official payment schedule, Pricelist R3 w.e.f Aug 31, 2026 (supersedes previous pricelists). Notes on the sheet: GST as per prevailing rates; electricity, water, sewerage and other infrastructure charges yet to be ascertained, payable at handover; registration and stamp duty payable at possession; electricity consumption deposit and advance maintenance collected with the final payment request; demands follow each tower’s milestones; Basic Value includes one car parking space for 3 BHK and two for 4 BHK; SBA subject to change. The sheet does not list sizes, base rate, PLC or club charges, so ask us for the current unit-wise cost sheet.
How it adds up: 9% + 6% + 5% + 10% = 30% within 90 days; then nothing until 15/01/2028 (the payment holiday); 10% + 10% = 20% at milestones from Jan 2028 and Jan 2029; and the last 50% from the terrace slab (not before 15/01/2030) through flooring, OC application and final payment. Year by year that is roughly 30% in 2026, 0% in 2027, 10% in 2028, 10% in 2029 and 50% from 2030 onwards, if milestones are on time; later milestones push demands later.
Official staggered payment plan (30:20:50)
SOBHA’s Oct 2026 offer creative shows a staggered plan: 30% now with a payment holiday till Jan 2028, 20% during 2028 & 2029 as a construction-linked plan, and 50% on completion & handover (“*Calculated as per the staggered payment plan”, T&C apply). On ₹2.81 Cr*:
| Stage | % | On ₹2.81 Cr* |
|---|---|---|
| Now (then payment holiday till Jan 2028) | 30% | ≈₹84.3 L + GST |
| During 2028 & 2029 (construction-linked) | 20% | ≈₹56.2 L + GST |
| On completion & handover | 50% | ≈₹140.5 L + GST, plus stamp duty and registration |
In plain words: after the 30%, the offer says there are no further builder demands until Jan 2028 (builder’s offer creative, Oct 2026, T&C apply). Confirm this with SOBHA before you book.
With 50% due at handover, most of a home loan would be disbursed late, so pre-EMI during construction is lower than on a regular CLP. Plan and price as per the builder’s offer creative, Oct 2026, T&C apply; confirm the current offer before booking. Details: SOBHA Rivana payment plan.
Timeline to plan for
UP RERA registration UPRERAPRJ313638/03/2026, declared completion 7 Feb 2031 (as on up-rera.in). Your money is committed for 4+ years, so plan rent and EMI together: RERA date vs actual possession.
Who this suits
Patient end users who value SOBHA's build quality and can carry rent plus EMI. Not for anyone who needs to move in soon. Gains (if any) depend on the market; nobody can promise them.
More: Sobha Rivana project page · Sobha Rivana review · Hidden charges in Noida flats
Disclosure: Futuristic Noida (Rohit Kumar Jha) is a RERA-registered channel partner for Godrej, Sobha, Stellar and Prestige projects and may earn brokerage from the developer on bookings made through us; this does not change your price. Gains (if any) depend on the market. Images marked "Artistic impression" are not photographs.
General information, not legal, tax or financial advice. Rules change; confirm with a lawyer/CA and the official portal before you pay. Futuristic Noida is a RERA-registered channel partner; brokerage may apply. No returns are promised.
Pictures: facade, landscape and clubhouse
SOBHA Rivana



Get the official SOBHA Rivana brochure
Leave your name and mobile; the brochure (PDF) opens right after.
A decade in real estate, including my years at 99acres. Send the document, I'll tell you straight. WhatsApp 9953793147 Request a call-back
Unit types & sizes
| Type | Home | Towers | Saleable (sq ft) | Carpet (sq ft) |
|---|---|---|---|---|
| G1 | 2 Bed Residence | T1, 2, 7, 8 | 1,373.65 | 742.48 |
| F1 | 2 Bed Grande | T1–6 | 1,653.73 | 854.86 |
| F4 | 2 Bed Grande | T7–8 | 1,653.73 | 854.86 |
| C1 | 3 Bed Grande | T1–6 | 1,982.91 | 1,082.86 |
| C4 | 3 Bed Grande | T7–8 | 1,982.91 | 1,082.86 |
| D1 | 3 Bed Luxe | T7 & 8 | 1,764.19 | 936.66 |
| D3 | 3 Bed Luxe + Terrace | T1 | 1,796.46 | 936.66 |
| E1 | 3 Bed Luxe | T1 | 1,752.34 | 953.13 |
| A1 | 4 Bed Grande | T4 | 2,714.37 | 1,469.63 |
| A2 | 4 Bed Grande | T8 | 2,715.80 | 1,469.61 |
| B1 | 4 Bed Luxe | T5 | 2,422.90 | 1,330.24 |
| B2 | 4 Bed Residence | T6 | 2,425.77 | 1,325.31 |
Source: SOBHA Rivana official floor-plan booklet. The current offer quotes 3 & 4 Bed prices only; 2 Bed price on request. See all floor plans on the SOBHA Rivana project page.
Videos
FAQ
What is the total cost of a Sobha Rivana 3 BHK?
About ₹3.18 Cr before extras for a ₹2.81 Cr* unit: basic plus 5% GST, ~7% stamp duty and 1% registration. Extras like PLC and parking come on top.
What is the EMI for Sobha Rivana?
Illustratively about ₹1.95 lakh a month on a ₹2.19 Cr loan at 8.5% for 20 years. Your bank’s rate will decide the real figure.
When is Sobha Rivana possession?
The declared completion date on UP RERA is 7 February 2031.
Is Futuristic Noida linked to SOBHA?
We are a RERA-registered channel partner and may earn brokerage from the developer. Your price is the same.
← All blog posts · Projects · RERA approved projects · Godrej DMIC Greater Noida · New launches in Noida · Contact