Short answer: ACE Arte in Sector 150, Noida is a new residential project, registered on UP RERA as UPRERAPRJ528653/07/2026 on 28 July 2026. Price: ≈₹4.24–9.61 Cr at the launch BSP of ₹21,995/sq ft (pre-launch was ₹16,995/sq ft) (checked 29 oct 2026). RERA completion: 15 February 2031. Below are the verified facts, an all-in cost example, honest reasons to buy and reasons to skip.
Key facts
| Item | Detail |
|---|---|
| UP RERA | UPRERAPRJ528653/07/2026 (registered 28 July 2026) |
| Launch | Registered 28 Jul 2026; the launch was announced for 15 Aug 2026 |
| Price | ≈₹4.24–9.61 Cr at the launch BSP of ₹21,995/sq ft (pre-launch was ₹16,995/sq ft) |
| Price source | ACE Arte price list w.e.f. 21 Aug 2026 as circulated for the project, not on ACE Group’s own site; our arithmetic on the listed sizes |
| Sizes | 3 BHK about 1,927 sq ft, 4 BHK about 2,614 sq ft, 4 BHK + servant room about 4,370 sq ft (tentative, saleable) |
| Payment plan | Ask ACE for the current plan in writing; launch-period plans change. |
| Completion | 15 February 2031 (UP RERA) |
The promoter on record is ACE Infracity Developers Pvt Ltd. Reports put it at about 15 acres, 11 towers and roughly 790 homes; it was called “ACE Parkway 2.0” during pre-launch and is separate from the delivered ACE Parkway next door. Check the registration yourself on up-rera.in.
All-in estimate
Builders quote a basic price. Taxes and charges add more. Here is a worked example at ₹4.24 Cr basic:
| Item | Approx. amount | Basis |
|---|---|---|
| Basic price (example) | ₹4.24 Cr | from the price source above |
| GST (5%, under construction) | ₹21.2 L | 5% without ITC on non-affordable housing |
| Stamp duty (7%) | ₹29.7 L | UP rate; a lower rate may apply to women buyers, check |
| Registration (1%) | ₹4.2 L | UP rate |
| Subtotal | ₹4.79 Cr | before parking, club, IFMS, PLC, power back-up and maintenance deposits |
EMI check
| Rate | EMI on 80% loan (₹3.39 Cr, 20 yrs) | Take-home needed (EMI = 50%) |
|---|---|---|
| 7.5% | ₹273,300 | ₹546,500 |
| 8.5% | ₹294,400 | ₹588,700 |
Illustrative only; SBI regular home loan rates were about 7.50–8.80% from 15 Oct 2026. Check your own rate and eligibility.
Why buy
- Sector 150 is Noida’s low-density Sports City sector with large green areas, close to the Expressway.
- ACE has delivered projects in the same sector, so you can visit a finished ACE building nearby.
- Sizes start near 1,900 sq ft: a family home, not a compact flat.
Who should skip it, and the risks
- The price jumped about 29% from pre-launch to launch (₹16,995 → ₹21,995/sq ft); don’t assume the same rise continues.
- You need a home before 2031.
- Sector 150 still has thin daily retail; most shopping is a drive away.
- Your budget is under about ₹4.8 Cr all-in for the smallest unit at launch BSP.
Location and connectivity
Sector 150 sits off the Noida–Greater Noida Expressway, about 5 km from the Yamuna Expressway entry and roughly 40 minutes from Noida International Airport. The Aqua Line extension towards Sector 142 was cleared by the Union Cabinet in February 2026 but is not running yet. Travel times are approximate; drive the route at your office hour before deciding.
Possession
The completion date on UP RERA is 15 February 2031 (UP RERA) Under-construction projects can be extended; read the quarterly progress reports on the portal.
Next steps
See the ACE Arte project page, the full list of May–Oct 2026 launches and our RERA check guide.
General information, not legal, tax or financial advice. Rules change; confirm with a lawyer/CA and the official portal before you pay. Futuristic Noida is a RERA-registered channel partner; brokerage may apply. No returns are promised.
A decade in real estate, including my years at 99acres. Send the document, I'll tell you straight. WhatsApp 9953793147 Request a call-back
FAQ
Is ACE Arte RERA registered?
Yes. UP RERA UPRERAPRJ528653/07/2026, registered 28 July 2026. Verify it on up-rera.in before paying.
What is the price of ACE Arte?
≈₹4.24–9.61 Cr at the launch BSP of ₹21,995/sq ft (pre-launch was ₹16,995/sq ft). Source: ACE Arte price list w.e.f. 21 Aug 2026 as circulated for the project, not on ACE Group’s own site; our arithmetic on the listed sizes.
When is possession of ACE Arte?
The RERA completion date is 15 February 2031 (UP RERA)
What does all-in cost include?
Roughly 5% GST, 7% stamp duty and 1% registration on top of the basic price, plus parking, club, IFMS, PLC and maintenance deposits where charged.
← All blog posts · Projects · RERA approved projects · Godrej DMIC Greater Noida · New launches in Noida · Contact