Short answer: Gaur Alaris (Phase 1) in Sector 22D, Yamuna Expressway is a new residential project, registered on UP RERA as UPRERAPRJ950965/07/2026 on 28 July 2026. Price: From ₹1.32 Cr at launch (HT); our current indicative range is ₹1.86–2.35 Cr* (checked 29 oct 2026). RERA completion: 9 June 2031. Below are the verified facts, an all-in cost example, honest reasons to buy and reasons to skip.
Key facts
| Item | Detail |
|---|---|
| UP RERA | UPRERAPRJ950965/07/2026 (registered 28 July 2026) |
| Launch | Launched 4 August 2026 (Hindustan Times) |
| Price | From ₹1.32 Cr at launch (HT); our current indicative range is ₹1.86–2.35 Cr* |
| Price source | Hindustan Times launch report, 4 Aug 2026; Gaurs’ own site shows price on request. The ₹1.86–2.35 Cr range is from our project page (indicative list dated 15 Oct 2026) |
| Sizes | 3 BHK about 1,550 sq ft and 3 BHK + study about 1,950 sq ft (Phase 1) |
| Payment plan | Ask Gaurs for the official schedule; we have not seen one on the builder’s own site. |
| Completion | 9 June 2031 (UP RERA) |
About 11.8 acres, roughly 1,088 homes, 8 towers in Phase 1 up to 34 storeys, with a large clubhouse designed by Hafeez Contractor and about 8 acres of greens (HT). Gaurs expects sales realisation of about ₹1,900 crore. Check the registration yourself on up-rera.in.
All-in estimate
Builders quote a basic price. Taxes and charges add more. Here is a worked example at ₹1.86 Cr basic:
| Item | Approx. amount | Basis |
|---|---|---|
| Basic price (example) | ₹1.86 Cr | from the price source above |
| GST (5%, under construction) | ₹9.3 L | 5% without ITC on non-affordable housing |
| Stamp duty (7%) | ₹13.0 L | UP rate; a lower rate may apply to women buyers, check |
| Registration (1%) | ₹1.9 L | UP rate |
| Subtotal | ₹2.10 Cr | before parking, club, IFMS, PLC, power back-up and maintenance deposits |
EMI check
| Rate | EMI on 80% loan (₹1.49 Cr, 20 yrs) | Take-home needed (EMI = 50%) |
|---|---|---|
| 7.5% | ₹119,900 | ₹239,700 |
| 8.5% | ₹129,100 | ₹258,300 |
Illustrative only; SBI regular home loan rates were about 7.50–8.80% from 15 Oct 2026. Check your own rate and eligibility.
Why buy
- One of the larger builders on the Yamuna Expressway, with many delivered homes in Greater Noida West to visit.
- Among the lower entry prices of the 2026 launches, for 3 BHK sizes.
- Sector 22D is close to Noida International Airport, which began commercial flights on 15 June 2026.
Who should skip it, and the risks
- You need possession before mid-2031.
- A large project (over 1,000 homes) means busy common areas and lifts.
- The YEIDA belt still has thin daily services; test the drive to your office and school.
- Prices quoted by different sellers already range widely; insist on a dated, signed cost sheet.
Location and connectivity
Sector 22D is a YEIDA residential sector on the Yamuna Expressway, near Buddh International Circuit and Gautam Buddha University. The airport at Jewar is roughly 15–20 km away (HT). Greater Noida’s Pari Chowk is about 15–20 minutes. Travel times are approximate; drive the route at your office hour before deciding.
Possession
The completion date on UP RERA is 9 June 2031 (UP RERA) Under-construction projects can be extended; read the quarterly progress reports on the portal.
Next steps
See the Gaur Alaris (Phase 1) project page, the full list of May–Oct 2026 launches and our RERA check guide.
General information, not legal, tax or financial advice. Rules change; confirm with a lawyer/CA and the official portal before you pay. Futuristic Noida is a RERA-registered channel partner; brokerage may apply. No returns are promised.
A decade in real estate, including my years at 99acres. Send the document, I'll tell you straight. WhatsApp 9953793147 Request a call-back
FAQ
Is Gaur Alaris (Phase 1) RERA registered?
Yes. UP RERA UPRERAPRJ950965/07/2026, registered 28 July 2026. Verify it on up-rera.in before paying.
What is the price of Gaur Alaris (Phase 1)?
From ₹1.32 Cr at launch (HT); our current indicative range is ₹1.86–2.35 Cr*. Source: Hindustan Times launch report, 4 Aug 2026; Gaurs’ own site shows price on request. The ₹1.86–2.35 Cr range is from our project page (indicative list dated 15 Oct 2026).
When is possession of Gaur Alaris (Phase 1)?
The RERA completion date is 9 June 2031 (UP RERA)
What does all-in cost include?
Roughly 5% GST, 7% stamp duty and 1% registration on top of the basic price, plus parking, club, IFMS, PLC and maintenance deposits where charged.
← All blog posts · Projects · RERA approved projects · Godrej DMIC Greater Noida · New launches in Noida · Contact