Short answer: Mahagun Medalleo is a 686-home project on a 40,000 sq m plot in Sector 107, Noida, registered on UP RERA as UPRERAPRJ125561 with a declared completion date of 7 Sep 2029. The mahagunltd.com Medalleo page, which says it is the site of an official Mahagun channel partner, shows 3 BHK homes from ₹2.75 Cr (checked 9 Nov 2026). Three things most WhatsApp forwards skip: that 3 BHK has a RERA carpet of only 1,314–1,345 sq ft (the page’s 2,500–2,575 sq ft is about 1.9 times that), the Mahagun group has just come out of an insolvency case over another of its projects, and the page and the RERA record disagree on basics like homes per floor. About 50 of the 84 construction months have passed, so this is a mid-build buy, not a launch.

The facts from UP RERA
| Mahagun Medalleo (UP RERA record) | |
|---|---|
| UP RERA number | UPRERAPRJ125561, registered 26 Sep 2022 |
| Promoter on RERA | Mahagun Infratech Pvt. Ltd (promoter ID UPRERAPRM159696). UP RERA lists 1 project under this promoter and 0 complaints against it |
| Complaints on this project | 0 (UP RERA, as in our 30 Oct 2026 data pull) |
| Plot | GH-01/A (ALPHA), 40,000 sq m (about 9.88 acres). Land document on RERA: registry document, Reg. no. 5695, Book 1, Vol. 10882, dated 8 Oct 2021 |
| Building permit | No. 2022/01/31/6228 dated 9 Sep 2022, valid to 8 Sep 2027 and shown as extendable to 7 Sep 2029 |
| Timeline | Proposed start 9 Sep 2022, 84 months; declared completion 7 Sep 2029; no extension row on the summary |
| Homes | 686 homes in 8 towers: six high-rise (homes on floors 1–12 and 14–28) and two low-rise of ground + 4 floors. Plus 60 shop or community units |
| Contractor and engineer on RERA | Rishi Builders Engineers and Constructors (Greater Noida); structural engineer Optimum Design Pvt. Ltd, Noida |
| Collection account | “Mahagun Infratech Private Limited – Collection Account For Mahagun Medalleo”, ICICI Bank, H Block Sector 63 Noida, account ending 2189 |
From the UP RERA project summary and detail pages for UPRERAPRJ125561 (fetched 7 Nov 2026); check them yourself on up-rera.in or on our RERA record page. The unit counts below come from the plan table on the detail page; the 686 residential homes match the 686 on the mahagunltd.com Medalleo page.
Every tower and carpet area, from the RERA table
| Tower (RERA name) | Homes | RERA carpet | Balcony | Notes |
|---|---|---|---|---|
| 5/Gold and 5/Platinum (high-rise) | 104 + 4 each | 3 BHK: 1,314 and 1,345 sq ft (52 of each, per tower) | 398 and 414 sq ft | Four homes a floor. Top floor 28: four larger homes of 2,309–2,335 sq ft carpet, listed “Other” |
| 3/Diamond (high-rise) | 104 + 4 | 4 BHK: 1,678 and 1,686 sq ft | 534 and 544 sq ft | Four a floor. Top floor: 2,880–2,897 sq ft |
| 3/Emerald (high-rise) | 104 + 4 | 4 BHK: 2,562 and 2,580 sq ft | 675 and 687 sq ft | Four a floor. Top floor: 3,742–3,875 sq ft |
| 4/Garnet and 4/Sapphire (high-rise) | 98 + 4 each | 4 BHK: 2,160 and 2,202 sq ft | 567 and 656 sq ft | Two to three homes on floors 1–4, four above. Top floor: 3,332–3,350 sq ft |
| 1/Amber and 2/Coral (low-rise, GF+4) | 20 + 5 each | 4 BHK: 1,982, 2,022, 2,262 and 2,328 sq ft | Varies by home | Five homes on each of five levels. The five on level 4 are 3,208–3,513 sq ft carpet, with balconies of about 1,480–1,700 sq ft |
Source: UP RERA plan table (fetched 7 Nov 2026); carpet and balcony converted from square metres at 10.764 sq ft per sq m and rounded. Home counts are residential homes only; the 60 shop and community units are excluded. 208 homes are 3 BHK, 444 are 4 BHK and 34 are the larger “Other” homes: 208 + 444 + 34 = 686.
- Only two towers have 3 BHKs. 5/Gold and 5/Platinum hold all 208. If you want a 3 BHK, those are the two towers to ask about. Every other high-rise tower is 4 BHK.
- The 4 BHK is not one home. RERA carpet runs from 1,678 sq ft (3/Diamond) to 2,580 sq ft (3/Emerald) in the high-rises, and 1,982–2,328 sq ft in the low-rise floors. The page quotes one super-area range for 4 BHK (2,970–3,720 sq ft) without saying which tower each size belongs to. Ask for the carpet and balcony of your exact unit before you compare any price.
- No homes on floor 13 or floor 29. The page says 29 floors. The RERA plan table lists homes on floors 1–12 and 14–28 in every high-rise tower, and none on floor 13 or 29. Ask what is on those levels.
- Low-rise floors are a different product. Two blocks of ground plus four levels with five homes a level. The page lists them from ₹3.23 Cr at 3,550–4,775 sq ft; the RERA table shows carpet of 1,982–3,513 sq ft in those blocks.
The price: ₹2.75 Cr is a “from” price, so test it on carpet
The mahagunltd.com Medalleo page shows 3 BHK from ₹2.75 Cr, 4 BHK from ₹4.09 Cr and low-rise 4 BHK from ₹3.23 Cr (checked 9 Nov 2026; the page itself says “updated on 4 Nov 2026”). It gives no unit-wise price sheet. Our own Mahagun Medalleo project page shows “price on request”, because we only print prices we can source to a dated page.
Here is the arithmetic for the entry 3 BHK, assuming ₹2.75 Cr is for the 2,500 sq ft home (the page does not say which size it applies to):
- ₹2.75 Cr ÷ 2,500 sq ft super area = ₹11,000 per sq ft.
- ₹2.75 Cr ÷ 1,314 sq ft RERA carpet = about ₹20,900 per sq ft of carpet. The 2,500 and 2,575 sq ft homes pair with the 1,314 and 1,345 sq ft carpets at 1.90 and 1.91 times.
- For the 4 BHK, the page does not map its sizes to towers, so we cannot honestly give you a per-carpet rate. A broker who quotes one without naming the tower is guessing.
| Item (illustrative, on ₹2.75 Cr) | Amount | Basis |
|---|---|---|
| Price shown: 3 BHK “from” | ₹2.75 Cr | On the mahagunltd.com page, 2,500–2,575 sq ft super area (checked 9 Nov 2026) |
| GST at 5% | ≈ ₹13.75 lakh | Under-construction home; see our GST guide |
| Stamp duty at 7% | ≈ ₹19.25 lakh | On the higher of agreement value and circle-rate value |
| Registration at 1% | ≈ ₹2.75 lakh | See our stamp duty table |
| Subtotal before extras | ≈ ₹3.11 Cr | Parking, club, IFMS, maintenance deposit and PLC are not published, so not included |
| TDS you must deduct (1%) | ≈ ₹2.75 lakh | Not an extra cost: it is part of the price, paid to the government on Form 141. See our TDS guide |
Illustration only, not a quote. Rates assume the usual under-construction GST of 5% without input credit and the stamp duty and registration rates used in our stamp duty table (stamp and registration rates are on IGRS UP). Your cost sheet will differ.
On the loading, 1.9 times is higher than the 1.82 we measured on Max Estates’ Estate 105 and sits within the range in our loading guide. The point is not that 1.9 is wrong. It is that you should compare ₹ per sq ft of carpet across projects, not the super-area rate a salesperson quotes.
Where the sales page and the RERA record disagree
| Topic | mahagunltd.com page | UP RERA record | What to do |
|---|---|---|---|
| Homes per floor | “Just two homes per floor in the high-rise blocks” | Four homes a floor in every high-rise tower (fewer on floors 1–4 of Garnet and Sapphire) | Ask for the floor plate and lift layout of your exact tower |
| Land area | 9.98 acres on the project page; a news item on the same site says 13 acres | 40,000 sq m, which is about 9.88 acres | Use the RERA figure |
| Clubhouse size | 50,000 sq ft in the overview; 70,000 sq ft in the FAQ | No club size on the RERA record; it lists a club house with gym, gaming zone and banquet hall | Get the club area, ownership and charges in the agreement |
| Homes you can buy | 3 BHK, 4 BHK and low-rise 4 BHK floors | Also 34 larger top-floor homes listed “Other” (24 in the towers, 10 in the low-rise) | Ask if those are on sale and what they are called |
| Title | “Removing title risk… entirely” | A registry document and an encumbrance report are uploaded; RERA does not certify title | Have your own lawyer read the title chain and a fresh encumbrance certificate |
Page: mahagunltd.com Medalleo page (checked 9 Nov 2026). RERA: UPRERAPRJ125561 (fetched 7 Nov 2026). The page also carries a “Special offer, book now… available for next few days only” banner. A RERA registration is not a deadline. Ask for the dated cost sheet and read it at home.
The Mahagun group news you should read before paying
Two public stories sit near this project. Neither is a reason to rule it out, and neither is something to ignore.
- A group insolvency case that ended in a settlement. Mahagun (India) Pvt Ltd was admitted into insolvency on 5 Aug 2025 after IDBI Trusteeship filed over an alleged ₹256.48 Cr default on debentures issued for Mahagun Manorialle in Sector 128 (Hindustan Times, 22 Feb 2026). The appellate tribunal set that admission aside on 6 Nov 2025 and sent the matter back. The parties settled on 12 Feb 2026 and the petition was withdrawn by an order dated 17 Feb 2026 (Business Standard, 21 Feb 2026; The Hindu BusinessLine). The creditor kept the right to revive the case if Mahagun fails to keep to the settlement. The insolvency reports tie the default to Manorialle. Medalleo’s UP RERA promoter is a different company, Mahagun Infratech Pvt. Ltd, so ask which Mahagun company signs your agreement and how it is funded. Business Standard’s sub-heading on the Medalleo exit story does link the two, describing “the stalled development” seeing “revival following NCLT relief”.
- A fund exit from Medalleo itself. ASK Property Fund said on 24 Mar 2026 that it had exited its Medalleo investment for ₹650 Cr after putting in ₹310 Cr in 2021, a 21% IRR for the fund, on a project of about 2.4 million sq ft saleable area (Business Standard, 24 Mar 2026). That means the project’s 2021 financier has been repaid. The reports differ on how: Business Standard’s sources say two-thirds came from internal accruals and a third from refinancing, while the Economic Times, 24 Mar 2026 quotes sources saying ₹400 Cr came from project cash flow and ₹250 Cr from an NBFC. Refinancing can mean a new charge on the land. The Economic Times, 24 Mar 2026 also quotes sources saying Mahagun “onboarded another developer to complete the project”; RERA lists Rishi Builders Engineers and Constructors as contractor, so ask who is building your tower today. Ask for a fresh encumbrance certificate and the lender’s no-objection to your sale.
We are not saying the project will fail: UP RERA shows 0 complaints on it and no extension. But an off-plan buyer is financing the builder, and one national paper has called this a stalled project that is reviving, so ask for site photos and the progress report for your tower. For how to read builders’ delivery history, see builders’ delivery records.
The date: 7 Sep 2029, and a permit that runs to 2027
- Time elapsed. From the 9 Sep 2022 proposed start to today is about 50 of the 84 months, with about 34 months to the declared date. How much is built is in the quarterly progress reports on UP RERA, not on a sales page (how to read a QPR). Ask for the latest report for your tower, and for dated site photos.
- The building permit. RERA shows permit validity to 8 Sep 2027 and extendable to 7 Sep 2029. Ask whether it has been revalidated and who pays any revalidation charge.
- Land papers. The RERA land entry cites a registry document, not a lease or allotment letter. Ask for the lease or sub-lease terms you will get and read sub-lease deed vs conveyance deed and freehold or leasehold.
- Possession date versus real possession. Plan around RERA date vs actual possession.
Who should look at it, and who shouldn’t
My honest read: Medalleo is a project to judge on who is funding and building it, not on the sales page. I would not pay a booking amount until I had the dated cost sheet, the QPR for my tower and a fresh encumbrance certificate in hand.
- Consider it if you want a 3 or 4 BHK in Sector 107, on the Noida–Greater Noida Expressway belt (see our Sector 107 guide), your all-in budget is ₹3.2 Cr or more, you can wait to 2029, and you are comfortable underwriting the builder, not just the flat.
- Skip it if you need to move in within three years, you want a home that is already built and certified, or the group-level news makes you want a lender-clean, completed building.
- Compare it with luxury apartments on the expressway and, on the same all-in-cost logic, Max Estates Estate 105. Before you sit with sales, read our price negotiation guide and sales pressure tactics.
Check it yourself
- Open UPRERAPRJ125561 on up-rera.in. Match the promoter, plot GH-01/A, the 7 Sep 2029 date and your unit’s carpet area against the tower table above.
- Pay only into the RERA collection account: “Mahagun Infratech Private Limited – Collection Account For Mahagun Medalleo”, ICICI Bank, account ending 2189. Never pay a broker or an individual. See how the RERA account works.
- Get the tower, floor, carpet, balcony, payment plan and every extra on a signed, dated cost sheet before any cheque. See is an EOI refundable.
- Download our free PDF guides, especially the UP RERA check and the all-in cost worksheet, and run the project through our RERA project checker. Questions? WhatsApp or call us on +91 99537 93147.
Project page: Mahagun Medalleo project page · RERA record: UPRERAPRJ125561 · Also read: site visit questions · why registries get stuck.
Sources: UP RERA project record UPRERAPRJ125561 (fetched 7 Nov 2026); mahagunltd.com Medalleo page (checked 9 Nov 2026); Business Standard, 24 Mar 2026 and Economic Times, 24 Mar 2026 on the ASK Property Fund exit; Business Standard, 21 Feb 2026, Hindustan Times, 22 Feb 2026 and The Hindu BusinessLine on the Mahagun (India) insolvency withdrawal. Mahagun is not one of the builders we are a channel partner for. Prices on the mahagunltd.com page can change without notice.
Disclosure: Futuristic Noida (Rohit Kumar Jha) is a RERA-registered channel partner for Godrej, Sobha, Stellar and Prestige projects and may earn brokerage from the developer on bookings made through us; this does not change your price. Gains (if any) depend on the market. Images marked "Artistic impression" are not photographs.
General information, not legal, tax or financial advice. Rules change; confirm with a lawyer/CA and the official portal before you pay. No returns are promised.
A decade in real estate, including my years at 99acres. Send the document, I'll tell you straight. WhatsApp 9953793147 Request a call-back
FAQ
What is the RERA number of Mahagun Medalleo, Sector 107 Noida?
UPRERAPRJ125561, registered on 26 Sep 2022. The promoter on UP RERA is Mahagun Infratech Pvt. Ltd and the declared completion date is 7 Sep 2029.
What is the price of Mahagun Medalleo?
The mahagunltd.com Medalleo page, which says it is an official Mahagun channel partner site, shows 3 BHK from ₹2.75 Cr, 4 BHK from ₹4.09 Cr and low-rise 4 BHK from ₹3.23 Cr (checked 9 Nov 2026). It has no unit-wise sheet. On the entry 3 BHK that is about ₹11,000 per sq ft of super area or about ₹20,900 per sq ft of RERA carpet, if ₹2.75 Cr is for the 2,500 sq ft home. GST, stamp duty and extras come on top.
What is the carpet area of Mahagun Medalleo flats?
On UP RERA: 3 BHK 1,314 and 1,345 sq ft; high-rise 4 BHK from 1,678 sq ft (3/Diamond) to 2,580 sq ft (3/Emerald); low-rise 4 BHK 1,982–2,328 sq ft. Larger top-floor homes run from about 2,309 to 3,875 sq ft carpet.
How many homes are there in Mahagun Medalleo?
686 residential homes in 8 towers per the UP RERA plan table: 208 3 BHK, 444 4 BHK and 34 larger top-floor homes, plus 60 shop or community units.
Is Mahagun Medalleo affected by the Mahagun insolvency case?
Press reports tie the insolvency petition against Mahagun (India) Pvt Ltd to debentures for Mahagun Manorialle in Sector 128, and it was withdrawn on 17 Feb 2026 after a settlement. Medalleo’s UP RERA promoter is a different company, Mahagun Infratech Pvt. Ltd, but Business Standard’s March 2026 report on a fund exit calls Medalleo a stalled development reviving after NCLT relief. Ask which company signs your agreement, how it is funded and what is built in your tower.